The Texas Eagle: Top Crop Wind Farm

Near Dwight, IL, the route passes a large wind turbine installation which I think is the Top Crop Wind Farm. The first two phases of the development include 200 1.5 MW GE turbines and phases III and IV should double that capacity with expansion further south into Livingston County.

12/28/2010 14:06:10
Top Crop Wind Farm (video) (video)
12/28/2010 13:48:20
Wind farm
12/28/2010 14:06:42
Wind farm
12/28/2010 14:06:52
Wind farm
12/28/2010 14:07:14
Wind farm
12/28/2010 14:07:48
The Texas Eagle: Top Crop Wind Farm

Next: The Texas Eagle: Joliet, IL (JOL)