Lacking any station stops in the 16-hour trip between Salt Lake City and
Denver, the train made a smoke stop at the Union Pacific facility in Green
River, WY to get a fresh crew. I also got to notice that we were being led
by a Union Pacific freight locomotive, reputedly because we needed the extra
power to get through the heavy snow.
In stark contrast to the Sinclair Refinery outside Rawlins, we passed a wind farm
which, I believe, is the Foote Creek Rim,
a comparatively small 60 MW facility built in phases between 1998 and 2000 in Carbon County.